ENERGY & BUILDING
PROJECTS UNDERTAKEN
Application Project
and Design Features
Energy Saving
(approximate)
__________ ______________________________ ____________
General Hospital Design
and install run-around coils 93kW
in
ward ventilation systems
General Hospital Design
and install complete air 40kW
conditioning
system for pharmacy
using
reversible heat pump
Grey Iron Design
and install fettling space heating 400kW
Foundry with
pre-heating recovery from hot
casting
conveyor transfer tunnel
Local Authority Diagnose
problems, modify and 41%
on
Leisure Centre commission
incomplete new swimming conventional
pool heat recovery plant with
electric boiler plant
drive heat pump. Then extend extract
ducting to include learner
pool in
system
Computer Company 1.
Survey and compile inventories of n/a
building services in main
location sites
throughout the country,
prepare new
maintenance systems and advise
on
contractor selection process
and
maintenance cost analysis.
2. Manage diagnosis and repair of n/a
defective main chilled water
plant
in several office buildings
3. Design sub-contractor for detailed n/a
cabling systems at major
Government
computer centre and new insurance
company head offices
Small office Design
and prepare specification for 10kW
development underfloor
heating system using medium
temperature
hot water
Tool Maker's Design
and install custom heat recovery 45kW
Factory plant
from sintered press cooling system
to
pre-heat shop space heating
Experimental Feasibility
studies and alternative designs 80kW
Fish Farm for
boiler replacement, heat pumps, CHP (heat
pump)
or
tidal pumped storage generation
London Designs
for new warm air heat recovery 60kW
Restaurant system
from kitchen with reversible
heat
pump as source
Rural Health Design
and install 3 panel solar 8600kWh
Centre pre-heating
system for domestic annually
hot
water
Paper Making Detailed
feasibility study into detailed
Factory replacement
of 2 chain grate 10
options
coal
fired boilers and 3.5kW
steam
turbine with new PFB
boilers
or 5MW gas turbine with
2MW
electricity exported to
adjacent
site over grid lines
Local Council Investigate
reasons for poor not
Main Offices performance
and control of main quantified
space
heating system, and recommend
improvements
London Auction 1.
Detailed design and supervise indirectly
Rooms installation
of new boiler plant; reduced
electric
heating
power
2. Detailed survey of electrical and associated
distribution
system and prepare high
system
specification
for improvements failure
rate
Local Authority Design,
develop and produce 33
per cent of
Rest Homes package
heat recovery system total
annual
for
laundry tumble driers; with electricity
70%
thermal efficiency consumption
Robert Barnes & Co, Consulting Engineers, Eastleigh.